Three key challenges in wind farm site development are:
1. Unexploded Ordnance (UXO) may be a safety and insurance concern for construction projects.
2. Cable and pipeline routes need to be planned, monitored and modeled.
3. A thorough understanding of the subsurface geotechnical properties are needed before wind turbines and cable routes can be constructed.
@MattGrove @SaraLiseUnderhay and @PhilipSuttak will be at Stand 105 during Wind Energy Hamburg to discuss these challenges and how Geosoft can help.
https://www.geosoft.com/events/windenergy-hamburg-2018
1. Unexploded Ordnance (UXO) may be a safety and insurance concern for construction projects.
2. Cable and pipeline routes need to be planned, monitored and modeled.
3. A thorough understanding of the subsurface geotechnical properties are needed before wind turbines and cable routes can be constructed.
@MattGrove @SaraLiseUnderhay and @PhilipSuttak will be at Stand 105 during Wind Energy Hamburg to discuss these challenges and how Geosoft can help.
https://www.geosoft.com/events/windenergy-hamburg-2018
Lorraine Godwin
Global Business Director

Global Business Director
Tagged:
0
This discussion has been closed.
Categories
- 771 All Categories
- 169 Products & Software
- 12 Seequent
- 224 Leapfrog
- 352 Geosoft
- 19 GeoStudio
- 11 Developers
- 1 Seequent Evo APIs
- 163 GX Developer
- 1 Early Access Programmes
- 2 Oasis montaj Field EAP